1. Integrate Content into C-Nario
a. Solution team sends delivery via Dropbox.
b. Download content to Z: drive into correct folder. If folder doesn't exist, create folder and name after content/airline.
c. Import layout/content into C-Nario.
ii. import into "to be deleted" folder in project tab.
ii. import into "to be deleted" or existing folder under resources in library tab.
d. Review the content to make sure everything is correct.
e. Modify the import or move content into correct trees in library tab.
2. Create Sequence (random solves)
a. In video folder under the newly imported experience, create sequence for random solves.
ii. Open/review the random solve spreadsheet.
b. Based on the random solve spreadsheet, move the correct assets onto the correct track within the sequence
c. Make sure to keep duration of playlist to specified time.
3. Integrate the random solves sequences and transitions playlist.
a. In the date folder under the imported experience, create new sequence.
b. Move the "random solves" sequence onto track 0
c. Go to transitions folder
a. Move the transitions playlist into track 1.
d. Make sure the Random Solves sequence matches the transitions PL.
ii. ex. A1_Ctran_PL_xxx_1 would match with A1_EXP_Random_xxx_1
e. Make sure to uncheck "Auto Trim"
f. Set start time, end time and duration of transition playlist
ii. Start time is 3 seconds before end of "random solves track.
ii. End time is3 seconds after end of "Random Solves track"
ii. Duration is 6 seconds
g. Make sure overall sequence duration is pre-specified time.
4. Move integrated random solve/transition sequence into playlist.
a. In the "GOAA Experience" folder, move previously prepared random solve/transition sequences into correct playlist
ii. Random solve/transition seq. A1_EXP_Random_xxx_1 would go into the playlist A1_xxx_xxx_Basic_pl_Alt_A
ii. Check with solutions team if playlist needs to be added multiple times.
b. Set schedule based on designated time frame
5. Set schedule for Experience Playlist
a. Add active period
b. Name after experience
c. Set date and time for schedule
d. Add working hours
e. Set working hours for 12:00 am - 11:59 pm
6. Verify all levels of content is correct, deploy.
a. Verify all content is correct at all levels
b. Move playlist in GOAA_EXPERIENCE tab to correct window in "projects" tab.
c. Save and transfer to correct node
d. Watch as transfer is complete (it will disappear after it reaches 100%)
e. Check snapshot to ensure playback hasn't been interrupted and correct content is displaying.